Lift columns for «Rosneft» JSC

Project
The delivery and absorbing wells
Customer
JSC Rosneft - JSC Samaraneftegaz
Terms
2006 – the present
Scale
25 wells with an average depth of 1275 m
Diameters
2,5" (Du of 63 mm)
Working pressure
From 3,4 to 35,0 MPas
Work scope
Fiberglass (glass reinforced epoxy) pipes manufacture and delivery
Complete ordering (packer, keys, subcontractors)
Installation supervision
Description
Due to the strong corrosive effect, "Samaraneftegaz" JSC decided to start a step-by-step pumping compressor tubes replacement with fiberglass in the Reservoir Pressure Maintaining system and in absorbing wells. The first wells were equipped with SIE "Fiberglass Pipes Plant" pipes in 2006 and have been in continuous operation for 10 years. "Samaraneftegaz" JSC recognized successful application experience and acquires fiberglass (glass reinforced epoxy) pipes on an annual basis.
SIE "Fiberglass Pipes Plant" advantages
Procurements are carried out within tender procedures in accordance with the FL-223 "On state-owned companies procurement". SIE "Fiberglass Pipes Plant" provides the lowest price, corresponds to the technical task, carries out the necessary services complex. Full-fledged technical partnership relations have been built for 10 years of cooperation in accordance with "Samaraneftegas" JSC wishes, engineering solutions were applied: optimal lubrication was selected, thread carvings were perfected, a packer installed by the tension on a fiberglass (glass reinforced epoxy) pipes column for one descent.