Pipeline and absorbing wells in Komi

Pipeline and absorbing wells in Komi
"Pechoraneftegas" operates sie "Fiberglass Pipes Plant" pipes since 2008

Project

The pipeline and the absorbing wells in Komi

Customer

Aravak Energy (CJSC Pechoraneftegaz)

Terms

2008-2011

Scale

3 pipelines with a total length more than 5 km and 2 wells on 2000 m everyone

Diameters

Pipelines: 6" (Du of 150 mm), wells: 2,5" (Du of 63 mm)

Pressure

Pipelines: 5,5 MPas, wells: 10,3 MPas

Work scope

Fiberglass (glass reinforced epoxy) pipes manufacture and delivery.
Order completion (grease, keys, shaped products).
Supervision and training.

Description

Fiberglass (glass reinforced epoxy) pipes were used at 4 capital construction sites in Sotchemuysk, East Sotchimuy-Taliysk and North-Ilielsk fields for mineralized bottom water and oil transportation/discharge in high corrosive wear areas.
The customer chose a comprehensive approach while using SIE "Fiberglass Pipes Plant" pipes in pipelines and wells construction while considering such fiberglass properties as electrochemical corrosion, salts deposition, cheap installation absence.

SIE "Fiberglass Pipes Plant" advantages

There are no claim regarding facilities operation built while using SIE "Fiberglass Pipes Plant" pipes for 9 operation years. Repair work related to leakage haven’t been carried out. Diagnosis and visual inspection show the excellent tube condition.
The customer notes the wells capacity has increased several times and SIE "Fiberglass Pipes Plant" pipes allowed "to completely resolve the corrosion and water lines maintenance issue".

Leave a request for calculating the cost of pipes